
Pulp & Paper
Gears, screws, shafts and bearing seats exposed to continuous wear and production-critical failures.

Typical pulp & paper repairs
How a job runs
Photos and dimensions
Send photos of the damage, a drawing or basic dimensions. Initial technical feedback usually within one business day.
Repair plan
We decide whether to repair, restore, reverse engineer or manufacture the part.
Workshop or on site
The work is done in our workshop in Tallinn or where the equipment is installed.
Back in service
The part is machined to size and returned.
Pulp & paper: completed works

Electric machine rotor
Worn bearing seats on an electric machine rotor
2 days Back to assembly

Motor rotor shaft
Worn journal on an electric motor rotor shaft

Clutch baskets
Clutch baskets required for replacement

Pulp mill screw
Worn screw from a pulp mill — could a new one be made instead of buying the original?
−40% Cost vs original spare part

Gearbox bearing cover
Broken gearbox bearing cover stopped production — no spare available
3 days From broken part to new cover

Electric motor end cover
Motor end cover, which is also the brake disc, cracked after a failed welding repair
2 days New cover manufactured

Hydraulic cylinders
Hydraulic cylinders requiring repair or new manufacture
Ø400 mm Max diameter
Send us the problem
Photos of the damage, a drawing or basic dimensions and information about where the component is installed are enough to start.
Initial technical feedback usually within one business day.